Another Quick Turn Around Training Model
This training model will familiarize people with the steps of an industrial process before they get into the actual field. The process being simulated is the replacement of a valve on a hydro-electric dam penstock.
All of this activity takes place deep underground. This valve replacement training model represents the underground room and the equipment used to replace the valve. The valves on the model have working parts.
The center piece of the model – the pipe – is 11ft in diameter in real life. KiwiMill replicated the pipe using a 6 inch diameter tube. The rest of the model was scaled around this size. Sometimes it is more economical for the client to have the model’s dimensions determined by parts that are readily available.
Everything was custom fabricated, assembled and painted in a little over a week, and then shipped to Canada for our customer’s immediate use.
fast turn around model, large equipment model, training model, valve replacement model